{"id":7509,"date":"2024-10-08T15:45:21","date_gmt":"2024-10-08T18:45:21","guid":{"rendered":"https:\/\/nossaradio.net.br\/96.3\/?p=7509"},"modified":"2024-10-08T15:45:21","modified_gmt":"2024-10-08T18:45:21","slug":"ccr-viasul-inicia-pavimentacao-na-duplicacao-do-trecho-de-soledade","status":"publish","type":"post","link":"https:\/\/nossaradio.net.br\/963\/ccr-viasul-inicia-pavimentacao-na-duplicacao-do-trecho-de-soledade\/","title":{"rendered":"CCR ViaSul inicia pavimenta\u00e7\u00e3o na duplica\u00e7\u00e3o do trecho de Soledade"},"content":{"rendered":"\n<p>Em nova atualiza\u00e7\u00e3o do andamento das obras de duplica\u00e7\u00e3o da BR-386\/RS no trecho entre Soledade Fontoura e Xavier, do km 245,3 ao km 270,9, a CCR ViaSul informa que trabalha nas camadas iniciais da pavimenta\u00e7\u00e3o da nova pista. Atualmente, as atividades est\u00e3o concentradas entre os kms 255 e 257, em Soledade.<\/p>\n\n\n\n<p>No segmento, as equipes da Concession\u00e1ria realizam a aplica\u00e7\u00e3o de camadas de sub-base em BGTC (Brita Graduada Tratada com Cimento) e base em BGMC (Brita Melhorada com Cimento). Estas camadas oferecem ganho estrutural fundamental ao pavimento, garantindo suporte \u00e0 camada de revestimento asf\u00e1ltico, cuja aplica\u00e7\u00e3o ser\u00e1 realizada posteriormente.<\/p>\n\n\n\n<p>Atualmente uma frente composta por cerca de 40 pessoas trabalha na atividade, executando em torno de 250 metros de pista utilizando uma m\u00e9dia de 900 toneladas de material, por dia.<\/p>\n\n\n\n<p>A programa\u00e7\u00e3o prev\u00ea, ainda, a continuidade dos servi\u00e7os em dire\u00e7\u00e3o aos kms 254 e 253. Por isso, uma nova equipe ser\u00e1 incorporada de forma a promover os trabalhos. A expectativa \u00e9 de que, a partir desse incremento de esfor\u00e7os, a produ\u00e7\u00e3o possa chegar a cerca de 700 metros de pista com aproximadamente, 2,5 mil toneladas de material, por dia.<\/p>\n\n\n\n<p>Duplica\u00e7\u00e3o do trecho Soledade a Fontoura Xavier<br>A expectativa da CCR ViaSul \u00e9 de que as obras contar\u00e3o com cerca de 800 oper\u00e1rios no per\u00edodo, divididos em tr\u00eas frentes executando os servi\u00e7os que v\u00e3o desde supress\u00e3o vegetal, drenagem, terraplenagem at\u00e9, posteriormente, pavimenta\u00e7\u00e3o e implanta\u00e7\u00e3o de nova sinaliza\u00e7\u00e3o pr\u00f3ximo \u00e0 conclus\u00e3o das a\u00e7\u00f5es. Ainda, outras frentes ficar\u00e3o respons\u00e1veis pela produ\u00e7\u00e3o de vigas, estacas e outras pe\u00e7as pr\u00e9-moldadas utilizadas nas novas passarelas, pontes e viadutos. Tamb\u00e9m, h\u00e1 a previs\u00e3o de utiliza\u00e7\u00e3o de algo em torno de 80 m\u00e1quinas em todo o trecho.<\/p>\n\n\n\n<p>De acordo com a CCR ViaSul, ser\u00e3o investidos no novo segmento cerca de R$ 340 milh\u00f5es, contemplando, al\u00e9m da duplica\u00e7\u00e3o, oito quil\u00f4metros de novas vias marginais, duas novas interse\u00e7\u00f5es, dois novos retornos, uma passagem inferior e duas novas pontes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"681\" src=\"https:\/\/novo.nossaradio.net.br\/963\/wp-content\/uploads\/sites\/7\/2024\/10\/ccr-via-sula_Easy-Resize.com_-1-1024x681.jpg\" alt=\"\" class=\"wp-image-7512\" srcset=\"https:\/\/redenossa.s3.us-west-2.amazonaws.com\/wp-content\/uploads\/sites\/7\/2024\/10\/13164816\/ccr-via-sula_Easy-Resize.com_-1-1024x681.jpg 1024w, https:\/\/redenossa.s3.us-west-2.amazonaws.com\/wp-content\/uploads\/sites\/7\/2024\/10\/13164816\/ccr-via-sula_Easy-Resize.com_-1-300x199.jpg 300w, https:\/\/redenossa.s3.us-west-2.amazonaws.com\/wp-content\/uploads\/sites\/7\/2024\/10\/13164816\/ccr-via-sula_Easy-Resize.com_-1-768x511.jpg 768w, https:\/\/redenossa.s3.us-west-2.amazonaws.com\/wp-content\/uploads\/sites\/7\/2024\/10\/13164816\/ccr-via-sula_Easy-Resize.com_-1-900x600.jpg 900w, https:\/\/redenossa.s3.us-west-2.amazonaws.com\/wp-content\/uploads\/sites\/7\/2024\/10\/13164816\/ccr-via-sula_Easy-Resize.com_-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Em nova atualiza\u00e7\u00e3o do andamento das obras de duplica\u00e7\u00e3o da BR-386\/RS no trecho entre Soledade Fontoura e Xavier, do km 245,3 ao km 270,9, a CCR ViaSul informa que trabalha nas camadas iniciais da pavimenta\u00e7\u00e3o da nova pista. Atualmente, as atividades est\u00e3o concentradas entre os kms 255 e 257, em Soledade. No segmento, as equipes [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":7510,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[266,239,249,262,265],"tags":[],"class_list":["post-7509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-galerias","category-noticias","category-podcasts","category-sem-categoria","category-variedades"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/posts\/7509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/comments?post=7509"}],"version-history":[{"count":0,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/posts\/7509\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/media\/7510"}],"wp:attachment":[{"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/media?parent=7509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/categories?post=7509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nossaradio.net.br\/963\/wp-json\/wp\/v2\/tags?post=7509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}